Onshore wind · United Kingdom
Power Generation Development in Castlederg
Operator Maxwell Concrete Ltd
Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 4 April 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Power Generation Development in Castlederg is a 0.3 MW wind farm 11 km south-west of Strabane, Co. Derry & Strabane, United Kingdom. Its planning application (LA11/2023/1313/F) went to Derry City and Strabane on 7 February 2023 and was granted on 29 March 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 23 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Power Generation Development in Castlederg changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Power Generation Development in Castlederg sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0422, Wind turbine fire prompts fire service response in Fermanagh, 35 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0422 | 2025 | Wind turbine fire prompts fire service response in Fermanagh | 35 km | Minor |
| EIR-1038 | 2017 | Wind turbine reported to have collapsed in Northern Ireland during severe storm | 41 km | Significant |
| EIR-1134 | 2017 | Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire | 181 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Maxwell Concrete Ltd
- Location
- 133m North West of 20 Folliard Road, Castlederg, Co. Derry & Strabane, BT81 7JW, United Kingdom
- Planning authority
- Derry City and Strabane
- Planning application
- LA11/2023/1313/F
- Turbines
- 1
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA11/2023/1313/F, with what the planning evidence pack adds for this site.
Every application in Derry City and Strabane · Alerts for applications and incidents near here
Timeline
- 7 February 2023 Planning application submitted
- 29 March 2024 Planning permission granted
- 29 March 2029 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Power Generation Development in Castlederg. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Power Generation Development in Castlederg had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Power Generation Development in Castlederg; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Power Generation Development in Castlederg?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 April 2024.
- Where is Power Generation Development in Castlederg?
- 11 km south-west of Strabane, Co. Derry & Strabane, United Kingdom (postcode BT81 7JW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).