← Back to Kent

Onshore wind · United Kingdom

Port of Sheerness Wind Farm (was Lappel Bank)

Operator Peel Energy · Owner Ayrshire Power Holdings Limited

Operational8.2 MWData checked 16 November 2026Source record dated 24 October 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Port of Sheerness Wind Farm (was Lappel Bank) is a 8.2 MW wind farm in Sheerness, Kent, United Kingdom. Its planning application (SW/08/0896) went to Swale on 26 August 2008 and was granted on 11 March 2009. It has been operating since 20 September 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 39 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 6 other sites and 458 energy sites within 40 km for Port of Sheerness Wind Farm (was Lappel Bank)

Members see the sites and incidents around this one, and every record behind them.

PEEL ENERGY CCS LIMITED (06714827), dissolved, since 2008. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
8.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Peel Energy
Owner
Ayrshire Power Holdings Limited
Location
Sheerness Docks, Sheerness, Kent, Kent, ME12 1RS, United Kingdom
Planning authority
Swale
Planning application
SW/08/0896
First operating
2016
Turbines
4, 125 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for SW/08/0896, with what the planning evidence pack adds for this site.

Every application in Swale · Alerts for applications and incidents near here

  • 26 August 2008 Planning application submitted
  • 11 March 2009 Planning permission granted
  • 6 August 2015 Construction started
  • 20 September 2016 Operational

None found. The register holds no published incident that names Port of Sheerness Wind Farm (was Lappel Bank). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Port of Sheerness Wind Farm (was Lappel Bank) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Port of Sheerness Wind Farm (was Lappel Bank); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Port of Sheerness Wind Farm (was Lappel Bank)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 October 2016.
Where is Port of Sheerness Wind Farm (was Lappel Bank)?
In Sheerness, Kent, United Kingdom (postcode ME12 1RS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).