Solar · United Kingdom

Port of Barry - Site 2

Operator Associated British Ports (ABP)

Operational5 MWData checked 16 November 2026Source record dated 24 October 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Port of Barry - Site 2 is a 5 MW solar farm on the edge of Barry, Vale of Glamorgan, United Kingdom. Its planning application (2015/00173/FUL) went to Vale of Glamorgan on 18 February 2013 and was granted on 15 April 2015. It has been operating since 16 April 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 38 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 3 other sites and 421 energy sites within 40 km for Port of Barry - Site 2

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Associated British Ports (ABP)
Location
Atlantic Way, Port of Barry, Barry, Vale of Glamorgan, CF63 3RA, United Kingdom
Planning authority
Vale of Glamorgan
Planning application
2015/00173/FUL
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2015/00173/FUL, with what the planning evidence pack adds for this site.

Every application in Vale of Glamorgan · Alerts for applications and incidents near here

  • 18 February 2013 Planning application submitted
  • 15 January 2015 Construction started
  • 15 April 2015 Planning permission granted
  • 16 April 2015 Operational

None found. The register holds no published incident that names Port of Barry - Site 2. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Port of Barry - Site 2 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Port of Barry - Site 2; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Port of Barry - Site 2?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 October 2016.
Where is Port of Barry - Site 2?
On the edge of Barry, Vale of Glamorgan, United Kingdom (postcode CF63 3RA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).