Solar · United Kingdom
Popehill Farm
Operator North Tenement Solar Limited
Operational5 MWData checked 16 November 2026Source record dated 11 August 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Popehill Farm is a 5 MW solar farm 3.4 km south of Haverfordwest, Pembrokeshire, United Kingdom. Its planning application (15/0443/PA) went to Pembrokeshire on 8 October 2015 and was granted on 18 May 2016. It has been operating since 29 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 31 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Popehill Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- North Tenement Solar Limited
- Location
- Land East of A4076(T), Popehill, Johnston, Haverfordwest, Dyfed, Pembrokeshire, SA62 3NX, United Kingdom
- Planning authority
- Pembrokeshire
- Planning application
- 15/0443/PA
- First operating
- 2017
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/0443/PA, with what the planning evidence pack adds for this site.
Every application in Pembrokeshire · Alerts for applications and incidents near here
Timeline
- 8 October 2015 Planning application submitted
- 18 May 2016 Planning permission granted
- 29 January 2017 Construction started
- 29 March 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Popehill Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Popehill Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Popehill Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Popehill Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 11 August 2017.
- Where is Popehill Farm?
- 3.4 km south of Haverfordwest, Pembrokeshire, United Kingdom (postcode SA62 3NX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).