Solar · Germany

PKV Intralogistikport 1

Operator Papier- u. Kartonfabrik Varel GmbH & Co. KG

Operational2.1 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

PKV Intralogistikport 1 is a 2.1 MW solar farm Friesland, Niedersachsen, Germany. It first operated in 2024. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is operational. The register holds no incident at this site. It holds 8 incidents at solar farms (hybrid battery and solar sites included) in Germany, and 480 worldwide.

Everything on this page

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
2.1 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Operational (In operation)
Operator
Papier- u. Kartonfabrik Varel GmbH & Co. KG
Location
Friesland, Niedersachsen, Germany
First operating
2024

  • 24 October 2024 Operational

None found. The register holds no published incident that names PKV Intralogistikport 1. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has PKV Intralogistikport 1 had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names PKV Intralogistikport 1; it holds 8 incidents at solar farms (hybrid battery and solar sites included) in Germany.
What is the status of PKV Intralogistikport 1?
Operational, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is PKV Intralogistikport 1?
Friesland, Niedersachsen, Germany.

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts.