Solar · United Kingdom

Pingry Farm - Phase 1

Operator Coleford Energy

Operational3.4 MWData checked 16 November 2026Source record dated 28 May 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pingry Farm - Phase 1 is a 3.4 MW solar farm on the edge of Coleford, Gloucestershire, United Kingdom. Its planning application (P1418/12/FUL) went to Forest of Dean on 6 March 2013 and was granted on 11 April 2013. It has been operating since 24 March 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 13 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 431 energy sites within 40 km for Pingry Farm - Phase 1

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
3.4 MW (this record)
All phases
6.8 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Coleford Energy
Location
Land At Pingry Farm, Pingry Lane, Milkwall, Coleford, Gloucestershire, GL16 8QD, United Kingdom
Planning authority
Forest of Dean
Planning application
P1418/12/FUL
First operating
2014

This record is 3.4 MW, one part of a site built in phases. With Pingry Farm - Phase 2 (3.4 MW) the phases on the register add up to 6.8 MW. Pingry Farm - Phase 2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P1418/12/FUL, with what the planning evidence pack adds for this site.

Every application in Forest of Dean · Alerts for applications and incidents near here

  • 6 March 2013 Planning application submitted
  • 11 April 2013 Planning permission granted
  • 1 January 2014 Construction started
  • 24 March 2014 Operational

None found. The register holds no published incident that names Pingry Farm - Phase 1. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Pingry Farm - Phase 1 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pingry Farm - Phase 1; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pingry Farm - Phase 1?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 May 2015.
Where is Pingry Farm - Phase 1?
On the edge of Coleford, Gloucestershire, United Kingdom (postcode GL16 8QD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).