Pinewood, Crockford Lane - Solar Panels

Operator Frasers Property UK Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 19 February 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pinewood, Crockford Lane - Solar Panels is a 0.2 MW solar farm 3.5 km north of Basingstoke, Hampshire, United Kingdom. Its planning application (23/03027/FUL) went to Basingstoke and Deane on 7 December 2023 and was granted on 15 February 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 45 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pinewood, Crockford Lane - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1273, Solar panels believed to have started roof fire at house in Old Basing, 2.8 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing2.8 kmMinor
EIR-15312022Fire involving solar panels damages roof of flats in Fleet16 kmSignificant
EIR-15342022Storm Eunice loosens solar panels on Eastleigh flats41 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Frasers Property UK Limited
Location
Pinewood, Crockford Lane, Chineham, Basingstoke, Hampshire, RG24 8AL, United Kingdom
Planning authority
Basingstoke and Deane
Planning application
23/03027/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/03027/FUL, with what the planning evidence pack adds for this site.

Every application in Basingstoke and Deane · Alerts for applications and incidents near here

  • 7 December 2023 Planning application submitted
  • 15 February 2024 Planning permission granted

None found. The register holds no published incident that names Pinewood, Crockford Lane - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Pinewood, Crockford Lane - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pinewood, Crockford Lane - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pinewood, Crockford Lane - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 February 2024.
Where is Pinewood, Crockford Lane - Solar Panels?
3.5 km north of Basingstoke, Hampshire, United Kingdom (postcode RG24 8AL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).