Pike Solar Hybrid

Operator Deriva Energy · Owner Pike Solar, LLC

Operational175 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pike Solar Hybrid is a 175 MW solar farm 12 km south-east of Fountain, El Paso County, Colorado, United States. It first operated in 2023. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 5 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

The operator's 87 other sites and 37 energy sites within 40 km for Pike Solar Hybrid

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
175 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Deriva Energy
Owner
Pike Solar, LLC
Location
El Paso County, Colorado, United States
First operating
2023
Balancing authority
PSCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Pike Solar Hybrid. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Pike Solar Hybrid had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pike Solar Hybrid; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Pike Solar Hybrid?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Pike Solar Hybrid?
12 km south-east of Fountain, El Paso County, Colorado, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).