Planning pack for this site, £295Other options

Solar · United Kingdom

Pearsons Assessment And Testing, Hellaby Ind Estate - Solar Panels

Operator CBRE

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 16 January 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pearsons Assessment And Testing, Hellaby Ind Estate - Solar Panels is a 0.2 MW solar farm on the edge of Maltby, South Yorkshire, United Kingdom. Its planning application (RB2022/1743) went to Rotherham on 22 November 2022 and was granted on 5 January 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 56 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pearsons Assessment And Testing, Hellaby Ind Estate - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 17 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster17 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof50 kmMinor
EIR-12652024Solar panels catch fire and destroy three buildings in Harby66 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
CBRE
Location
Pearsons Assessment & Testing Ltd Hellaby Industrial Estate Fretwell Road Hellaby, South Yorkshire, S66 8HN, United Kingdom
Planning authority
Rotherham
Planning application
RB2022/1743

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for RB2022/1743, with what the planning evidence pack adds for this site.

Every application in Rotherham · Alerts for applications and incidents near here

  • 22 November 2022 Planning application submitted
  • 5 January 2023 Planning permission granted

None found. The register holds no published incident that names Pearsons Assessment And Testing, Hellaby Ind Estate - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Pearsons Assessment And Testing, Hellaby Ind Estate - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pearsons Assessment And Testing, Hellaby Ind Estate - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pearsons Assessment And Testing, Hellaby Ind Estate - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 January 2023.
Where is Pearsons Assessment And Testing, Hellaby Ind Estate - Solar Panels?
On the edge of Maltby, South Yorkshire, United Kingdom (postcode S66 8HN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).