Planning pack for this site, £295Other options

Solar · United Kingdom

Partridge Hill Solar Farm

Operator Green Switch Solutions/Belvedere Energy Developments

Awaiting Construction33 MWData checked 16 November 2026Source record dated 18 March 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Partridge Hill Solar Farm is a 33 MW solar farm 5.1 km north-east of Bircotes, South Yorkshire, United Kingdom. Its planning application (15/01268/FULM) went to Doncaster on 20 May 2015 and was granted on 29 July 2016. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 24 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Partridge Hill Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 2.6 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster2.6 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof58 kmMinor
EIR-12652024Solar panels catch fire and destroy three buildings in Harby66 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
33 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Green Switch Solutions/Belvedere Energy Developments
Location
Partridge Hill Farm, High Common Lane, Austerfield, Doncaster, South Yorkshire, South Yorkshire, DN10 6HA, United Kingdom
Planning authority
Doncaster
Planning application
15/01268/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/01268/FULM, with what the planning evidence pack adds for this site.

Every application in Doncaster · Alerts for applications and incidents near here

  • 20 May 2015 Planning application submitted
  • 29 July 2016 Planning permission granted
  • 29 July 2019 Planning permission expired

None found. The register holds no published incident that names Partridge Hill Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Partridge Hill Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Partridge Hill Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Partridge Hill Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 March 2020.
Where is Partridge Hill Solar Farm?
5.1 km north-east of Bircotes, South Yorkshire, United Kingdom (postcode DN10 6HA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).