Solar · United Kingdom
Park Road
Operator Earthworm Energy · Owner Renewable Land Resources Limited
Application Refused5 MWData checked 17 November 2026Source record dated 4 May 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Park Road is a 5 MW solar farm on the edge of Swadlincote, Derbyshire, United Kingdom. Its planning application (9/2015/0689) went to South Derbyshire on 1 September 2015 and was refused on 21 April 2016. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 54 other energy sites within 10 km, 32 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Park Road changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
EARTHWORM ENERGY LIMITED (08584559), dissolved, since 2013. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Earthworm Energy
- Owner
- Renewable Land Resources Limited
- Location
- LAND AT SK2720, 3150 Park Road, Newhall, Swadlincote, Derbyshire, DE11 0TT, United Kingdom
- Planning authority
- South Derbyshire
- Planning application
- 9/2015/0689
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 9/2015/0689, with what the planning evidence pack adds for this site.
Every application in South Derbyshire · Alerts for applications and incidents near here
Timeline
- 1 September 2015 Planning application submitted
- 21 April 2016 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Park Road. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Park Road had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Park Road; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Park Road?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 4 May 2016.
- Where is Park Road?
- On the edge of Swadlincote, Derbyshire, United Kingdom (postcode DE11 0TT).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).