Onshore wind · United Kingdom
Parc-Cynog Wind Farm
Operator Micon Wind Turbines (UK) Limited
Operational3.6 MWData checked 16 November 2026Source record dated 30 October 2011
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Parc-Cynog Wind Farm is a 3.6 MW wind farm 19 km south-west of Carmarthen, Dyfed, United Kingdom. Its planning application went to Carmarthenshire on 5 May 1998 and was granted on 1 February 2000. It has been operating since 1 February 2001. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 4 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Parc-Cynog Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 3.6 MW (this record)
- All phases
- 12 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Micon Wind Turbines (UK) Limited
- Location
- Parc-Cynog FarmPendineCarmarthenshire, Dyfed, United Kingdom
- Planning authority
- Carmarthenshire
- First operating
- 2001
- Turbines
- 5
This record is 3.6 MW, one part of a site built in phases. With Parc Cynog Extension (8.4 MW) the phases on the register add up to 12 MW. Parc Cynog Extension
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Carmarthenshire · Alerts for applications and incidents near here
Timeline
- 5 May 1998 Planning application submitted
- 1 February 2000 Planning permission granted
- 1 February 2001 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Parc-Cynog Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Parc-Cynog Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Parc-Cynog Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Parc-Cynog Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 30 October 2011.
- Where is Parc-Cynog Wind Farm?
- 19 km south-west of Carmarthen, Dyfed, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).