Solar · United Kingdom

Palk Road, Bedhampton - Solar Panels

Operator Portsmouth Water

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 11 November 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Palk Road, Bedhampton - Solar Panels is a 0.3 MW solar farm in Havant, Hampshire, United Kingdom. Its planning application (APP/21/01169) went to Havant on 12 October 2021 and was granted on 28 January 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 47 other energy sites within 10 km, 33 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PORTSMOUTH WATER LIMITED (02536455), active, since 1990. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Palk Road, Bedhampton - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2076, Fire across four homes in Leigh Park most likely linked to solar panel equipment, fire service says, 0.8 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20762020Fire across four homes in Leigh Park most likely linked to solar panel equipment, fire service says0.8 kmSignificant
EIR-15292023Fire contained to solar panels on Gosport flats roof11 kmMinor
EIR-20852020Fire involving solar panels at a house in Barnham, West Sussex25 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Portsmouth Water
Location
Palk Road, Bedhampton, Hampshire, PO9 1NL, United Kingdom
Planning authority
Havant
Planning application
APP/21/01169

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/21/01169, with what the planning evidence pack adds for this site.

Every application in Havant · Alerts for applications and incidents near here

  • 12 October 2021 Planning application submitted
  • 28 January 2022 Planning permission granted
  • 28 January 2025 Planning permission expired

None found. The register holds no published incident that names Palk Road, Bedhampton - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Palk Road, Bedhampton - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Palk Road, Bedhampton - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Palk Road, Bedhampton - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 November 2021.
Where is Palk Road, Bedhampton - Solar Panels?
In Havant, Hampshire, United Kingdom (postcode PO9 1NL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).