← Back to Hampshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Allington Lane, West End - Solar panels

Operator Portsmouth Water

Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 29 November 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Allington Lane, West End - Solar panels is a 0.5 MW solar farm 3.1 km south of Eastleigh, Hampshire, United Kingdom. Its planning application (PN/21/91711) went to Eastleigh on 11 October 2021 and was granted on 22 November 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 72 other energy sites within 10 km, 50 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PORTSMOUTH WATER LIMITED (02536455), active, since 1990. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Allington Lane, West End - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1534, Storm Eunice loosens solar panels on Eastleigh flats, 3.4 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15342022Storm Eunice loosens solar panels on Eastleigh flats3.4 kmMinor
EIR-15292023Fire contained to solar panels on Gosport flats roof22 kmMinor
EIR-20762020Fire across four homes in Leigh Park most likely linked to solar panel equipment, fire service says26 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Portsmouth Water
Location
Itchen Power Limited, Portsmouth Water, Allington Lane, West End, Southampton, Hampshire, SO30 3HQ, United Kingdom
Planning authority
Eastleigh
Planning application
PN/21/91711

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PN/21/91711, with what the planning evidence pack adds for this site.

Every application in Eastleigh · Alerts for applications and incidents near here

  • 11 October 2021 Planning application submitted
  • 22 November 2021 Planning permission granted

None found. The register holds no published incident that names Allington Lane, West End - Solar panels. If you know of one, report it (confidential reports are anonymised).

Has Allington Lane, West End - Solar panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Allington Lane, West End - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Allington Lane, West End - Solar panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 November 2021.
Where is Allington Lane, West End - Solar panels?
3.1 km south of Eastleigh, Hampshire, United Kingdom (postcode SO30 3HQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).