Onshore wind · United Kingdom

Ovenden Moor (Repower)

Operator Yorkshire Windpower

Operational18 MWData checked 16 November 2026Source record dated 2 February 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ovenden Moor (Repower) is a 18 MW wind farm 5.5 km west of Thornton, West Yorkshire, United Kingdom. Its planning application (12/00955/WDF) went to Calderdale on 2 August 2012 and was granted on 16 November 2012. It has been operating since 24 January 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 31 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 1 other site and 524 energy sites within 40 km for Ovenden Moor (Repower)

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
18 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Yorkshire Windpower
Location
Withens Road, Wainstalls, Halifax, West Yorkshire, United Kingdom
Planning authority
Calderdale
Planning application
12/00955/WDF
First operating
2017
Turbines
9, 115 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 12/00955/WDF, with what the planning evidence pack adds for this site.

Every application in Calderdale · Alerts for applications and incidents near here

  • 2 August 2012 Planning application submitted
  • 16 November 2012 Planning permission granted
  • 21 May 2015 Construction started
  • 24 January 2017 Operational

None found. The register holds no published incident that names Ovenden Moor (Repower). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Ovenden Moor (Repower) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ovenden Moor (Repower); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Ovenden Moor (Repower)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 February 2017.
Where is Ovenden Moor (Repower)?
5.5 km west of Thornton, West Yorkshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).