Solar · United Kingdom
Orton Solar Farm
Operator New Energy for the World
Application Refused5 MWData checked 16 November 2026Source record dated 29 June 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Orton Solar Farm is a 5 MW solar farm 16 km north-east of Kendal, Cumbria, United Kingdom. Its planning application (15/0667) went to Westmorland and Furness on 12 August 2015 and was refused on 9 June 2016. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 4 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Orton Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- New Energy for the World
- Location
- Land Between M6 Carriageways, Orton, Penrith, Cumbria, CA10 3SB, United Kingdom
- Planning authority
- Westmorland and Furness
- Planning application
- 15/0667
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/0667, with what the planning evidence pack adds for this site.
Every application in Westmorland and Furness · Alerts for applications and incidents near here
Timeline
- 12 August 2015 Planning application submitted
- 9 June 2016 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Orton Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Orton Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Orton Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Orton Solar Farm?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 29 June 2016.
- Where is Orton Solar Farm?
- 16 km north-east of Kendal, Cumbria, United Kingdom (postcode CA10 3SB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).