← Back to Cumbria

Solar · United Kingdom

Orton Solar Farm

Operator New Energy for the World

Application Refused5 MWData checked 16 November 2026Source record dated 29 June 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Orton Solar Farm is a 5 MW solar farm 16 km north-east of Kendal, Cumbria, United Kingdom. Its planning application (15/0667) went to Westmorland and Furness on 12 August 2015 and was refused on 9 June 2016. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 4 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 12 other sites and 68 energy sites within 40 km for Orton Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
New Energy for the World
Location
Land Between M6 Carriageways, Orton, Penrith, Cumbria, CA10 3SB, United Kingdom
Planning authority
Westmorland and Furness
Planning application
15/0667

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/0667, with what the planning evidence pack adds for this site.

Every application in Westmorland and Furness · Alerts for applications and incidents near here

  • 12 August 2015 Planning application submitted
  • 9 June 2016 Planning permission refused

None found. The register holds no published incident that names Orton Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Orton Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Orton Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Orton Solar Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 29 June 2016.
Where is Orton Solar Farm?
16 km north-east of Kendal, Cumbria, United Kingdom (postcode CA10 3SB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).