Planning pack for this site, £295Other options

Solar · United Kingdom

Orchard Mead Academy, Keyham Lane West - Solar Panels

Operator eEnergy Group Plc

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 8 May 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Orchard Mead Academy, Keyham Lane West - Solar Panels is a 0.3 MW solar farm on the edge of Humberstone, Leicestershire, United Kingdom. Its planning application (20260096) went to Leicester on 27 January 2026 and was granted on 13 March 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 35 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

EENERGY GROUP PLC (05357433), active, since 2005. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Orchard Mead Academy, Keyham Lane West - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2151, Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge, 1.3 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge1.3 kmSignificant
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property19 kmSignificant
EIR-12652024Solar panels catch fire and destroy three buildings in Harby27 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
eEnergy Group Plc
Location
Orchard Mead Academy, Keyham Lane West, Leicestershire, LE5 1RT, United Kingdom
Planning authority
Leicester
Planning application
20260096

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20260096, with what the planning evidence pack adds for this site.

Every application in Leicester · Alerts for applications and incidents near here

  • 27 January 2026 Planning application submitted
  • 13 March 2026 Planning permission granted

None found. The register holds no published incident that names Orchard Mead Academy, Keyham Lane West - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Orchard Mead Academy, Keyham Lane West - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Orchard Mead Academy, Keyham Lane West - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Orchard Mead Academy, Keyham Lane West - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 May 2026.
Where is Orchard Mead Academy, Keyham Lane West - Solar Panels?
On the edge of Humberstone, Leicestershire, United Kingdom (postcode LE5 1RT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).