Solar · United Kingdom
Ockendon Landfill Solar Farm
Operator NTR Plc
Operational38 MWData checked 16 November 2026Source record dated 14 September 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Ockendon Landfill Solar Farm is a 38 MW solar farm 3.2 km north-east of South Ockendon, Essex, United Kingdom. Its planning application (14/00836/FUL) went to Thurrock on 29 July 2014 and was granted on 22 January 2016. It has been operating since 1 September 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 73 other energy sites within 10 km, 33 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Ockendon Landfill Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 38 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- NTR Plc
- Location
- South Ockendon Quarry And Landfill Site Medebridge Road South Ockendon Essex, Essex, RM15 6SL, United Kingdom
- Planning authority
- Thurrock
- Planning application
- 14/00836/FUL
- First operating
- 2023
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 14/00836/FUL, with what the planning evidence pack adds for this site.
Every application in Thurrock · Alerts for applications and incidents near here
Timeline
- 29 July 2014 Planning application submitted
- 22 January 2016 Planning permission granted
- 1 September 2022 Construction started
- 1 September 2023 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Ockendon Landfill Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Ockendon Landfill Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Ockendon Landfill Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Ockendon Landfill Solar Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 September 2023.
- Where is Ockendon Landfill Solar Farm?
- 3.2 km north-east of South Ockendon, Essex, United Kingdom (postcode RM15 6SL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).