Around this site

← Back to São Paulo

Solar · Brazil

Novo Oriente solar farm

Operational253 MWChecked 8 October 2026Last changed in the dataset 12 January 2026

Technology
Solar
Capacity
253 MW
Status
Operational (Operating)
Operator
EDP Renováveis Brasil
Owner
EDP Renováveis [100%]
Location
Ilha Solteira, Região Geográfica Intermediária de Araçatuba, São Paulo, Brazil
First operating
2024
Phases in the tracker
6

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Novo Oriente solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.