← Back to Suffolk
Planning pack for this site, £295Other options

Solar · United Kingdom

Northern Road, Chilton Industrial Estate - Solar Park

Operator JCS Hi-Torque Limited

Awaiting Construction0.7 MWData checked 16 November 2026Source record dated 20 June 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Northern Road, Chilton Industrial Estate - Solar Park is a 0.7 MW solar farm in Sudbury, Suffolk, United Kingdom. Its planning application (DC/22/02948) went to Babergh on 9 June 2022 and was granted on 24 August 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 10 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Northern Road, Chilton Industrial Estate - Solar Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2589, Rooftop solar panels reported to have overheated and sparked fire at Colchester church, 21 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-25892022Rooftop solar panels reported to have overheated and sparked fire at Colchester church21 kmSignificant
EIR-28152026Solar panel on school roof starts primary school fire in Ipswich28 kmSignificant
EIR-27312021Electrical fault in solar panel control unit sparks loft fire in Ipswich28 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
JCS Hi-Torque Limited
Location
1 Northern Road Chilton Industrial Estate, Suffolk, CO10 2YH, United Kingdom
Planning authority
Babergh
Planning application
DC/22/02948

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DC/22/02948, with what the planning evidence pack adds for this site.

Every application in Babergh · Alerts for applications and incidents near here

  • 9 June 2022 Planning application submitted
  • 24 August 2022 Planning permission granted
  • 24 August 2025 Planning permission expired

None found. The register holds no published incident that names Northern Road, Chilton Industrial Estate - Solar Park. If you know of one, report it (confidential reports are anonymised).

Has Northern Road, Chilton Industrial Estate - Solar Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Northern Road, Chilton Industrial Estate - Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Northern Road, Chilton Industrial Estate - Solar Park?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 20 June 2022.
Where is Northern Road, Chilton Industrial Estate - Solar Park?
In Sudbury, Suffolk, United Kingdom (postcode CO10 2YH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).