← Back to Norfolk

Battery storage · United Kingdom

North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme

Operator Next Energy

Operational6 MWData checked 16 November 2026Source record dated 20 March 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme is a 6 MW battery storage site 3.4 km south of Cromer, Norfolk, United Kingdom. Its planning application (PF/21/3122) went to North Norfolk on 23 November 2021 and was granted on 19 December 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 7 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 1 other site and 139 energy sites within 40 km for North Norfolk Business Centre Solar Park - Battery Energy…

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Co-located with RE)
Capacity
6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Next Energy
Location
Manor Farm Crossdale Street Northrepps Cromer, Norfolk, NR27 9LD, United Kingdom
Planning authority
North Norfolk
Planning application
PF/21/3122

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PF/21/3122, with what the planning evidence pack adds for this site.

Every application in North Norfolk · Alerts for applications and incidents near here

  • 23 November 2021 Planning application submitted
  • 19 December 2022 Planning permission granted
  • 17 February 2025 Planning permission expired

None found. The register holds no published incident that names North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 March 2024.
Where is North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme?
3.4 km south of Cromer, Norfolk, United Kingdom (postcode NR27 9LD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).