← Back to North Sea
Planning pack for this site, £295Other options

Offshore wind · Germany

Nordlicht wind farm

Owner BASF SE [49%]; Vattenfall AB [51%]

Planned (permitted)1,610 MWData checked 8 October 2026Source record dated 26 March 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Nordlicht wind farm is a 1,610 MW offshore wind farm 7.4 km north of Borkum, North Sea, Germany. It first operated in 2028. Its status in the Global Energy Monitor solar and wind trackers is planned (permitted). There are 3 other energy sites within 10 km. The register holds no incident at this site. It holds 32 incidents at wind farms in Germany, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Nordlicht wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 6 comparable offshore wind incidents in Germany, nearest first. The nearest is EIR-0730, Blade failure on Vestas 15MW turbine at He Dreiht offshore wind farm, 116 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07302026Blade failure on Vestas 15MW turbine at He Dreiht offshore wind farm116 kmSignificant
EIR-21582013Diver killed during construction of Riffgat offshore wind farm116 kmMajor
EIR-11642018Monopile crashes onto quay at Port of Rostock359 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 3 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Offshore wind
Capacity
1,610 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Planned (permitted) (Pre-construction)
Owner
BASF SE [49%]; Vattenfall AB [51%]
Location
North Sea, Germany
First operating
2028
Phases in the tracker
2

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Nordlicht wind farm. If you know of one, report it (confidential reports are anonymised).

Has Nordlicht wind farm had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names Nordlicht wind farm; it holds 32 incidents at wind farms in Germany.
What is the status of Nordlicht wind farm?
Planned (permitted), in the Global Energy Monitor solar and wind trackers, where it last changed on 26 March 2025.
Where is Nordlicht wind farm?
7.4 km north of Borkum, North Sea, Germany.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).