Around this site

← Back to Ningxia

Solar · China

Ningxia Huinong Waste Management Area solar farm

Planned (permitted)200 MWChecked 8 October 2026Last changed in the dataset 5 June 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ningxia Huinong Waste Management Area solar farm sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
200 MW
Status
Planned (permitted) (Pre-construction)
Owner
Shizuishan Ranerte New Energy Co Ltd [100%]
Location
Shizuishan, Ningxia, China

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Ningxia Huinong Waste Management Area solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.