Next Distribution Centre Doncaster

Operator Next& Eneco

Operational2.5 MWData checked 16 November 2026Source record dated 1 June 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Next Distribution Centre Doncaster is a 2.5 MW solar farm in Armthorpe, South Yorkshire, United Kingdom. Its planning application went to Doncaster. It has been operating since 1 December 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 46 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

622 energy sites within 40 km for Next Distribution Centre Doncaster

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
2.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Next& Eneco
Location
Lincolnshire Way, Armthorpe, Doncaster, South Yorkshire, DN3 3FF, United Kingdom
Planning authority
Doncaster
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Doncaster · Alerts for applications and incidents near here

  • 1 November 2016 Construction started
  • 1 December 2016 Operational

None found. The register holds no published incident that names Next Distribution Centre Doncaster. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Next Distribution Centre Doncaster had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Next Distribution Centre Doncaster; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Next Distribution Centre Doncaster?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 June 2017.
Where is Next Distribution Centre Doncaster?
In Armthorpe, South Yorkshire, United Kingdom (postcode DN3 3FF).