Planning pack for this site, £295Other options

Solar · United Kingdom

Newlands Meadow, Eden - Solar Panels

Operator Hollywood Bowl Group

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 22 June 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Newlands Meadow, Eden - Solar Panels is a 0.2 MW solar farm in High Wycombe, Buckinghamshire, United Kingdom. Its planning application (22/06368/PNP14J) went to Buckinghamshire on 10 June 2022 and was granted on 4 August 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 22 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

HOLLYWOOD BOWL GROUP PLC (10229630), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Newlands Meadow, Eden - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1519, Solar panels involved in outbuilding roof fire in Bourne End, 5.7 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End5.7 kmMinor
EIR-29392026Rooftop solar fire forces West Drayton school to close early24 kmSignificant
EIR-07742023Solar panel fire destroys roof of Ealing Council house in Greenford29 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Hollywood Bowl Group
Location
15 To 17 Newlands Meadow Eden High, Buckinghamshire, HP11 2DQ, United Kingdom
Planning authority
Buckinghamshire
Planning application
22/06368/PNP14J

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/06368/PNP14J, with what the planning evidence pack adds for this site.

Every application in Buckinghamshire · Alerts for applications and incidents near here

  • 10 June 2022 Planning application submitted
  • 4 August 2022 Planning permission granted

None found. The register holds no published incident that names Newlands Meadow, Eden - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Newlands Meadow, Eden - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Newlands Meadow, Eden - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Newlands Meadow, Eden - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 22 June 2022.
Where is Newlands Meadow, Eden - Solar Panels?
In High Wycombe, Buckinghamshire, United Kingdom (postcode HP11 2DQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).