← Back to North Dakota
Planning pack for this site, £295Other options

Onshore wind · United States

New Salem Wind II

Operator New Salem Wind II · Owner Nextera Energy Resources

Planned226 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

New Salem Wind II is a 226 MW wind farm 42 km west of Mandan, Morton County, North Dakota, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 107 incidents at wind farms in the United States, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for New Salem Wind II sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 105 comparable onshore wind incidents in the United States, nearest first. The nearest is EIR-0918, Rotor and blades fall from turbine at Rugby wind farm, North Dakota, 205 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-09182011Rotor and blades fall from turbine at Rugby wind farm, North Dakota205 kmSignificant
EIR-16892026Engie wind farm damaged by high winds in South Dakota296 kmSignificant
EIR-08482017Nacelle fire and blade loss at Endeavor I wind farm, Osceola County, Iowa594 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 102 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
226 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
New Salem Wind II
Owner
Nextera Energy Resources
Location
Morton County, North Dakota, United States
Expected
2028
Balancing authority
MISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names New Salem Wind II. If you know of one, report it (confidential reports are anonymised).

Has New Salem Wind II had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names New Salem Wind II; it holds 107 incidents at wind farms in the United States.
What is the status of New Salem Wind II?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is New Salem Wind II?
42 km west of Mandan, Morton County, North Dakota, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).