Solar · United Kingdom
Nether Mill Farm
Operator AEE Renewables
Operational3.1 MWData checked 16 November 2026Source record dated 27 November 2014
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Nether Mill Farm is a 3.1 MW solar farm 4.9 km north of Cullompton, Devon, United Kingdom. Its planning application (12/01518/MFUL) went to Mid Devon on 31 October 2012 and was granted on appeal on 19 February 2014. It has been operating since 1 September 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 37 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Nether Mill Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 3.1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- AEE Renewables
- Location
- Halberton, Devon, EX15 2QQ, United Kingdom
- Planning authority
- Mid Devon
- Planning application
- 12/01518/MFUL
- First operating
- 2014
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 12/01518/MFUL, with what the planning evidence pack adds for this site.
Every application in Mid Devon · Alerts for applications and incidents near here
Timeline
- 31 October 2012 Planning application submitted
- 19 February 2013 Planning permission refused
- 19 February 2014 Planning permission granted
- 19 February 2014 Appeal granted
- 1 September 2014 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Nether Mill Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Nether Mill Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Nether Mill Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Nether Mill Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 November 2014.
- Where is Nether Mill Farm?
- 4.9 km north of Cullompton, Devon, United Kingdom (postcode EX15 2QQ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).