Battery storage · United Kingdom

National Grid Enderby Substation

Operator Gore Street · Owner Enderby Battery Storage Limited

Operational57 MWData checked 16 November 2026Source record dated 6 March 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

National Grid Enderby Substation is a 57 MW battery storage site in Enderby, Leicestershire, United Kingdom. Its planning application (20/0896/FUL) went to Blaby on 28 August 2020 and was granted on 4 February 2021. It has been operating since 1 February 2025. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 61 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

648 energy sites within 40 km for National Grid Enderby Substation

Members see the sites and incidents around this one, and every record behind them.

1 planned or unplanned unavailability notice published under REMIT, 13 Nov 2026. Members see each notice: planned or unplanned, the capacity out, the dates and the cause given.

Contains BMRS data © Elexon Limited copyright and database right. Read each morning; a notice can be withdrawn or revised by the operator.

Technology
Battery storage (Stand-alone Storage)
Capacity
57 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Gore Street
Owner
Enderby Battery Storage Limited
Location
National Grid Land To North Of, Desford Road, Enderby, Leicester, Leicestershire, Leicestershire, LE19 4AD, United Kingdom
Planning authority
Blaby
Planning application
20/0896/FUL
First operating
2025

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/0896/FUL, with what the planning evidence pack adds for this site.

Every application in Blaby · Alerts for applications and incidents near here

  • 28 August 2020 Planning application submitted
  • 4 February 2021 Planning permission granted
  • 1 January 2023 Construction started
  • 1 February 2025 Operational

None found. The register holds no published incident that names National Grid Enderby Substation. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has National Grid Enderby Substation had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names National Grid Enderby Substation; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of National Grid Enderby Substation?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 6 March 2026.
Where is National Grid Enderby Substation?
In Enderby, Leicestershire, United Kingdom (postcode LE19 4AD).