Onshore wind · United Kingdom

Myreton Crossroads

Operator Seren Energy

Operational1.6 MWData checked 16 November 2026Source record dated 19 September 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Myreton Crossroads is a 1.6 MW wind farm 11 km south-east of Buckie, Grampian, United Kingdom. Its planning application (09/00247/FUL) went to Moray on 9 February 2009 and was granted on appeal on 19 July 2010. It has been operating since 5 July 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 14 other energy sites within 10 km, 9 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

168 energy sites within 40 km for Myreton Crossroads

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
1.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Seren Energy
Location
Keith Moray AB55 6NJ, Grampian, United Kingdom
Planning authority
Moray
Planning application
09/00247/FUL
Appeal reference
10/00005/REF
First operating
2013
Turbines
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 09/00247/FUL, with what the planning evidence pack adds for this site.

Every application in Moray · Alerts for applications and incidents near here

  • 9 February 2009 Planning application submitted
  • 10 December 2009 Planning permission refused
  • 19 July 2010 Planning permission granted
  • 19 July 2010 Appeal granted
  • 1 March 2012 Construction started
  • 5 July 2013 Operational

None found. The register holds no published incident that names Myreton Crossroads. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Myreton Crossroads had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Myreton Crossroads; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Myreton Crossroads?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 19 September 2013.
Where is Myreton Crossroads?
11 km south-east of Buckie, Grampian, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).