Planning pack for this site, £295Other options

Solar · United Kingdom

Mynydd y Gwryhd Solar Farm

Operator Awel Aman Tawe

Awaiting Construction2.3 MWData checked 16 November 2026Source record dated 7 October 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mynydd y Gwryhd Solar Farm is a 2.3 MW solar farm on the edge of Brynamman, Neath Port Talbot, United Kingdom. Its planning application (P2020/0408) went to Neath Port Talbot on 10 June 2020 and was granted on 27 November 2020. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 17 other energy sites within 10 km, 4 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mynydd y Gwryhd Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 86 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea86 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels95 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol95 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
2.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Awel Aman Tawe
Location
Land To The West Of, Cwmgors On Mynydd Uchaf, Adjoining Community Wind Turbi, Swansea, West Glamorgan, Neath Port Talbot, SA9, United Kingdom
Planning authority
Neath Port Talbot
Planning application
P2020/0408

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P2020/0408, with what the planning evidence pack adds for this site.

Every application in Neath Port Talbot · Alerts for applications and incidents near here

  • 10 June 2020 Planning application submitted
  • 27 November 2020 Planning permission granted
  • 27 November 2025 Planning permission expired

None found. The register holds no published incident that names Mynydd y Gwryhd Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Mynydd y Gwryhd Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mynydd y Gwryhd Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Mynydd y Gwryhd Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 October 2020.
Where is Mynydd y Gwryhd Solar Farm?
On the edge of Brynamman, Neath Port Talbot, United Kingdom (postcode SA9).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).