Planning pack for this site, £295Other options

Solar · United Kingdom

Morrisons Supermarket, Rubery - Solar Photovoltaics

Operator WM Morrisons Supermarkets Plc

Awaiting Construction0.6 MWData checked 16 November 2026Source record dated 29 November 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Morrisons Supermarket, Rubery - Solar Photovoltaics is a 0.6 MW solar farm 4.1 km north of Barnt Green, West Midlands, United Kingdom. Its planning application (2021/09747/PA) went to Birmingham on 15 November 2021 and was granted on 5 January 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 34 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Morrisons Supermarket, Rubery - Solar Photovoltaics sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college14 kmMinor
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home20 kmSignificant
EIR-01722026Fire at Wheat Leasows solar farm in Telford involves an electricity pylon47 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
WM Morrisons Supermarkets Plc
Location
Morrisons Supermarket, Bristol Road South, Rubery, West Midlands, B45 9AH, United Kingdom
Planning authority
Birmingham
Planning application
2021/09747/PA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2021/09747/PA, with what the planning evidence pack adds for this site.

Every application in Birmingham · Alerts for applications and incidents near here

  • 15 November 2021 Planning application submitted
  • 5 January 2022 Planning permission granted

None found. The register holds no published incident that names Morrisons Supermarket, Rubery - Solar Photovoltaics. If you know of one, report it (confidential reports are anonymised).

Has Morrisons Supermarket, Rubery - Solar Photovoltaics had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Morrisons Supermarket, Rubery - Solar Photovoltaics; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Morrisons Supermarket, Rubery - Solar Photovoltaics?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 November 2021.
Where is Morrisons Supermarket, Rubery - Solar Photovoltaics?
4.1 km north of Barnt Green, West Midlands, United Kingdom (postcode B45 9AH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).