Solar · United Kingdom
Morrisons Supermarket, Rochester - Solar panels
Operator WM Morrisons Supermarkets Plc
Awaiting ConstructionData checked 16 November 2026Source record dated 6 April 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Morrisons Supermarket, Rochester - Solar panels is a solar farm in Rochester, Kent, United Kingdom. Its planning application (MC/22/0709) went to Medway on 17 March 2022 and was granted on 19 May 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 31 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Morrisons Supermarket, Rochester - Solar panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Morrisons Supermarket, Rochester - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1530, Electrical fault causes solar panel fire in Wickford house, 24 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1530 | 2023 | Electrical fault causes solar panel fire in Wickford house | 24 km | Minor |
| EIR-1537 | 2021 | Garage fire from overheated solar batteries in South Woodham Ferrers | 28 km | Minor |
| EIR-1173 | 2024 | Rooftop solar panel fire on residential block in Lewisham, London | 36 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- WM Morrisons Supermarkets Plc
- Location
- Morrisons Supermarket, Knight Road Strood, Strood, Rochester, Kent, ME2 2AA, United Kingdom
- Planning authority
- Medway
- Planning application
- MC/22/0709
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for MC/22/0709, with what the planning evidence pack adds for this site.
Every application in Medway · Alerts for applications and incidents near here
Timeline
- 17 March 2022 Planning application submitted
- 19 May 2022 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Morrisons Supermarket, Rochester - Solar panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Morrisons Supermarket, Rochester - Solar panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Morrisons Supermarket, Rochester - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Morrisons Supermarket, Rochester - Solar panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 April 2022.
- Where is Morrisons Supermarket, Rochester - Solar panels?
- In Rochester, Kent, United Kingdom (postcode ME2 2AA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).