← Back to Kent
Planning pack for this site, £295Other options

Solar · United Kingdom

Mill Road - Solar panels

Operator Medway Council

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 17 December 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mill Road - Solar panels is a 0.3 MW solar farm in Gillingham, Kent, United Kingdom. Its planning application (MC/21/3543) went to Medway on 9 December 2021 and was granted on 14 March 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 25 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mill Road - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1530, Electrical fault causes solar panel fire in Wickford house, 25 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15302023Electrical fault causes solar panel fire in Wickford house25 kmMinor
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers28 kmMinor
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London39 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Medway Council
Location
Medway Park Leisure Centre Mill Road Gillingham, Kent, ME7 1HF, United Kingdom
Planning authority
Medway
Planning application
MC/21/3543

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for MC/21/3543, with what the planning evidence pack adds for this site.

Every application in Medway · Alerts for applications and incidents near here

  • 9 December 2021 Planning application submitted
  • 14 March 2022 Planning permission granted

None found. The register holds no published incident that names Mill Road - Solar panels. If you know of one, report it (confidential reports are anonymised).

Has Mill Road - Solar panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mill Road - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Mill Road - Solar panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 17 December 2021.
Where is Mill Road - Solar panels?
In Gillingham, Kent, United Kingdom (postcode ME7 1HF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).