Solar · United Kingdom
Moorhouse Farm, Moorhouse Lane - Solar Park
Operator Cabot Park Solar Limited
Under Construction3.8 MWData checked 16 November 2026Source record dated 18 November 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Moorhouse Farm, Moorhouse Lane - Solar Park is a 3.8 MW solar farm 7.8 km north-west of Bristol, Gloucestershire, United Kingdom. Its planning application (22/05849/F) went to Bristol, City of on 3 January 2023 and was granted on 30 April 2024. Construction started on 1 November 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 85 other energy sites within 10 km, 59 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Moorhouse Farm, Moorhouse Lane - Solar Park changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Moorhouse Farm, Moorhouse Lane - Solar Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1416, Fire at Bristol hospital started in solar panels, 9.5 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1416 | 2025 | Fire at Bristol hospital started in solar panels | 9.5 km | Significant |
| EIR-1274 | 2022 | Fire damages rooftop solar panels at We The Curious in Bristol | 9.5 km | Significant |
| EIR-2065 | 2021 | Loft fire believed caused by a solar panel at Paintworks flats in Bristol | 10 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 3.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Cabot Park Solar Limited
- Location
- N/O Moorhouse Farm, Moorhouse Lane, Bristol, Gloucestershire, BS10 7RU, United Kingdom
- Planning authority
- Bristol, City of
- Planning application
- 22/05849/F
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 22/05849/F, with what the planning evidence pack adds for this site.
Every application in Bristol, City of · Alerts for applications and incidents near here
Timeline
- 3 January 2023 Planning application submitted
- 30 April 2024 Planning permission granted
- 1 November 2025 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Moorhouse Farm, Moorhouse Lane - Solar Park. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Moorhouse Farm, Moorhouse Lane - Solar Park had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Moorhouse Farm, Moorhouse Lane - Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Moorhouse Farm, Moorhouse Lane - Solar Park?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 November 2025.
- Where is Moorhouse Farm, Moorhouse Lane - Solar Park?
- 7.8 km north-west of Bristol, Gloucestershire, United Kingdom (postcode BS10 7RU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).