Solar · United Kingdom

Minster Abbey, Bedlam Court Lane - Solar PV panels

Operator The Benedictine Nuns of St Mildreds Priory

Under Construction33 MWData checked 6 October 2026Source record dated 23 September 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Minster Abbey, Bedlam Court Lane - Solar PV panels is a 33 MW solar farm 5 km south of Birchington-on-Sea, Kent, United Kingdom. Its planning application (F/TH/21/1365) went to Thanet on 9 September 2021. Construction started on 1 April 2022. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 47 other energy sites within 10 km, 31 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Minster Abbey, Bedlam Court Lane - Solar PV panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2069, Solar panel fire spreads through roof of new flats at Ebbsfleet, 3.0 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20692021Solar panel fire spreads through roof of new flats at Ebbsfleet3.0 kmSignificant
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers60 kmMinor
EIR-22232023Homeowners allege solar panel fault caused Tolleshunt Knights house fire63 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
33 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
The Benedictine Nuns of St Mildreds Priory
Location
Minster Abbey Bedlam Court Lane, Ramsgate, Kent, CT12 4HF, United Kingdom
Planning authority
Thanet
Planning application
F/TH/21/1365

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for F/TH/21/1365, with what the planning evidence pack adds for this site.

Every application in Thanet · Alerts for applications and incidents near here

  • 9 September 2021 Planning application submitted
  • 1 April 2022 Construction started

None found. The register holds no published incident that names Minster Abbey, Bedlam Court Lane - Solar PV panels. If you know of one, report it (confidential reports are anonymised).

Has Minster Abbey, Bedlam Court Lane - Solar PV panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Minster Abbey, Bedlam Court Lane - Solar PV panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Minster Abbey, Bedlam Court Lane - Solar PV panels?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 September 2021.
Where is Minster Abbey, Bedlam Court Lane - Solar PV panels?
5 km south of Birchington-on-Sea, Kent, United Kingdom (postcode CT12 4HF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).