← Back to Iowa
Planning pack for this site, £295Other options

Solar · United States

Mills Solar Project

Operator MidAmerican Energy Co

Under construction50 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mills Solar Project is a 50 MW solar farm 19 km west of Red Oak, Mills County, Iowa, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mills Solar Project sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-2853, Severe storm damages panels and wiring at Peoria County solar farm, 494 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-28532026Severe storm damages panels and wiring at Peoria County solar farm494 kmSignificant
EIR-29622025Grass fire beneath solar panels at Peoria solar farm494 kmMinor
EIR-28042026Transformer fire at St Cloud solar farm wastewater plant514 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
50 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Under construction
Operator
MidAmerican Energy Co
Owner
MidAmerican Energy Co
Location
Mills County, Iowa, United States
Expected
2026
Balancing authority
MISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Mills Solar Project. If you know of one, report it (confidential reports are anonymised).

Has Mills Solar Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mills Solar Project; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Mills Solar Project?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Mills Solar Project?
19 km west of Red Oak, Mills County, Iowa, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).