Solar · United Kingdom
Mill Farm
Operator RALOS New Energy
Abandoned5 MWData checked 16 November 2026Source record dated 14 December 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Mill Farm is a 5 MW solar farm in Garswood, Greater Manchester, United Kingdom. Its planning application (A/15/81185/MAJOR) went to Wigan on 22 July 2015 and was granted on 16 December 2015. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 63 other energy sites within 10 km, 35 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Mill Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Abandoned
- Operator or applicant
- RALOS New Energy
- Location
- Land At Mill Farm, Downall Green Road, Ashton-in-Makerfield, Wigan, Greater Manchester, WN4 0NA, United Kingdom
- Planning authority
- Wigan
- Planning application
- A/15/81185/MAJOR
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for A/15/81185/MAJOR, with what the planning evidence pack adds for this site.
Every application in Wigan · Alerts for applications and incidents near here
Timeline
- 22 July 2015 Planning application submitted
- 16 December 2015 Planning permission granted
- 16 December 2018 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Mill Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Mill Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Mill Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Mill Farm?
- Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 14 December 2018.
- Where is Mill Farm?
- In Garswood, Greater Manchester, United Kingdom (postcode WN4 0NA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).