Solar · United States
Milford Solar Phase II
Operator Milford Solar Phase II, LLC
Under construction310 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Milford Solar Phase II is a 310 MW solar farm Beaver County, Utah, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There are 7 other energy sites within 10 km, 4 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.
Get an email when Milford Solar Phase II changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Milford Solar Phase II sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-0456, Vegetation fire at Beryl, Utah solar farm doused by fire crews, 90 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0456 | 2025 | Vegetation fire at Beryl, Utah solar farm doused by fire crews | 90 km | Minor |
| EIR-2010 | 2023 | Arrest reported after damage at Dry Lake Solar Plant near Las Vegas | 320 km | Significant |
| EIR-1510 | 2015 | Birds ignite mid-air at Nevada solar plant during tests | 370 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 310 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Under construction
- Operator
- Milford Solar Phase II, LLC
- Owner
- Milford Solar Phase II, LLC
- Location
- Beaver County, Utah, United States
- Expected
- 2027
- Balancing authority
- LDWP
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Milford Solar Phase II. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Milford Solar Phase II had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Milford Solar Phase II; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
- What is the status of Milford Solar Phase II?
- Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Milford Solar Phase II?
- Beaver County, Utah, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts.