Merks Hill Farm, Braintree Road - Solar Farm

Operator Sky UK Development Limited · Owner Octopus Renewables Limited

Awaiting Construction12 MWData checked 16 November 2026Source record dated 7 October 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Merks Hill Farm, Braintree Road - Solar Farm is a 12 MW solar farm in Great Dunmow, Essex, United Kingdom. Its planning application (UTT/25/1374/FUL) went to Uttlesford on 28 May 2025 and was granted on 24 September 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 17 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

SKY UK DEVELOPMENT LIMITED (13630960), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Merks Hill Farm, Braintree Road - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2223, Homeowners allege solar panel fault caused Tolleshunt Knights house fire, 30 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-22232023Homeowners allege solar panel fault caused Tolleshunt Knights house fire30 kmMajor
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers31 kmMinor
EIR-15302023Electrical fault causes solar panel fire in Wickford house31 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
12 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Sky UK Development Limited
Owner
Octopus Renewables Limited
Location
Merks Hill Farm, W/O Great Dunmow, Braintree Road, Dunmow, Essex, CM6 1HU, United Kingdom
Planning authority
Uttlesford
Planning application
UTT/25/1374/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for UTT/25/1374/FUL, with what the planning evidence pack adds for this site.

Every application in Uttlesford · Alerts for applications and incidents near here

Status changed from Application Submitted to Awaiting Construction on 16 November 2026.

  • 28 May 2025 Planning application submitted
  • 24 September 2026 Planning permission granted
  • 24 September 2029 Planning permission runs out

None found. The register holds no published incident that names Merks Hill Farm, Braintree Road - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Merks Hill Farm, Braintree Road - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Merks Hill Farm, Braintree Road - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Merks Hill Farm, Braintree Road - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Merks Hill Farm, Braintree Road - Solar Farm?
In Great Dunmow, Essex, United Kingdom (postcode CM6 1HU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).