Onshore wind · United Kingdom
Meikleton of Ardonald
Operator CleanEarth
Awaiting Construction1 MWData checked 16 November 2026Source record dated 9 October 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Meikleton of Ardonald is a 1 MW wind farm 22 km south of Buckie, Aberdeenshire, United Kingdom. Its planning application (APP/2023/1228) went to Aberdeenshire on 29 June 2023 and was granted on 4 October 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 20 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Meikleton of Ardonald changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Meikleton of Ardonald sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1386, Wind turbine fire near St Cyrus in Aberdeenshire, 84 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1386 | 2022 | Wind turbine fire near St Cyrus in Aberdeenshire | 84 km | Minor |
| EIR-0767 | 2024 | Nordex turbine fire prompts investigation at Scottish wind farm | 106 km | Significant |
| EIR-0063 | 2024 | Fatal fall from turbine nacelle during onshore wind maintenance, UK | 106 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- CleanEarth
- Location
- Meikleton Of Ardonald, Cairnie, Huntly, Grampian, Aberdeenshire, AB54 4UB, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2023/1228
- Turbines
- 1, 135 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2023/1228, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 29 June 2023 Planning application submitted
- 4 October 2023 Planning permission granted
- 4 October 2026 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Meikleton of Ardonald. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Meikleton of Ardonald had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Meikleton of Ardonald; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Meikleton of Ardonald?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 9 October 2023.
- Where is Meikleton of Ardonald?
- 22 km south of Buckie, Aberdeenshire, United Kingdom (postcode AB54 4UB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).