Solar · United States
McGinness Hills 3
Operator Ormat Nevada Inc
Under construction14 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
McGinness Hills 3 is a 14 MW solar farm Lander County, Nevada, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.
Get an email when McGinness Hills 3 changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for McGinness Hills 3 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1510, Birds ignite mid-air at Nevada solar plant during tests, 169 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1510 | 2015 | Birds ignite mid-air at Nevada solar plant during tests | 169 km | Minor |
| EIR-0456 | 2025 | Vegetation fire at Beryl, Utah solar farm doused by fire crews | 338 km | Minor |
| EIR-1403 | 2023 | Vegetation fire burns nearly 60 acres on a solar farm near Jamestown | 355 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 14 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Under construction
- Operator
- Ormat Nevada Inc
- Owner
- Ormat Nevada Inc
- Location
- Lander County, Nevada, United States
- Expected
- 2027
- Balancing authority
- NEVP
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names McGinness Hills 3. If you know of one, report it (confidential reports are anonymised).
Questions
- Has McGinness Hills 3 had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names McGinness Hills 3; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
- What is the status of McGinness Hills 3?
- Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is McGinness Hills 3?
- Lander County, Nevada, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts.