McGinness Hills 3

Operator Ormat Nevada Inc

Under construction14 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

McGinness Hills 3 is a 14 MW solar farm Lander County, Nevada, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for McGinness Hills 3 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1510, Birds ignite mid-air at Nevada solar plant during tests, 169 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15102015Birds ignite mid-air at Nevada solar plant during tests169 kmMinor
EIR-04562025Vegetation fire at Beryl, Utah solar farm doused by fire crews338 kmMinor
EIR-14032023Vegetation fire burns nearly 60 acres on a solar farm near Jamestown355 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
14 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Under construction
Operator
Ormat Nevada Inc
Owner
Ormat Nevada Inc
Location
Lander County, Nevada, United States
Expected
2027
Balancing authority
NEVP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names McGinness Hills 3. If you know of one, report it (confidential reports are anonymised).

Has McGinness Hills 3 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names McGinness Hills 3; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of McGinness Hills 3?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
Where is McGinness Hills 3?
Lander County, Nevada, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts.