Battery storage · United Kingdom

Mauxhall Farm

Operator Lyceum Solar · Owner Mauxhall Farm Energy Park Limited

Operational25 MWData checked 16 November 2026Source record dated 24 August 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Mauxhall Farm is a 25 MW battery storage site on the edge of Immingham, Humberside, United Kingdom. Its planning application (DM/1145/19/FUL) went to North East Lincolnshire on 17 December 2019 and was granted on 21 May 2021. It has been operating since 1 December 2025. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 59 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 1 other site and 306 energy sites within 40 km for Mauxhall Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Co-located with RE)
Capacity
25 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lyceum Solar
Owner
Mauxhall Farm Energy Park Limited
Location
Mauxhall Farm, Immingham Road, Stallingborough, Grimsby, Humberside, Humberside, DN41 8BS, United Kingdom
Planning authority
North East Lincolnshire
Planning application
DM/1145/19/FUL
First operating
2025

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/1145/19/FUL, with what the planning evidence pack adds for this site.

Every application in North East Lincolnshire · Alerts for applications and incidents near here

Status changed from Planning Permission Expired to Operational on 16 November 2026.

  • 17 December 2019 Planning application submitted
  • 6 November 2020 Planning permission refused
  • 21 May 2021 Planning permission granted
  • 1 August 2025 Construction started
  • 1 December 2025 Operational

None found. The register holds no published incident that names Mauxhall Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Mauxhall Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mauxhall Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Mauxhall Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Mauxhall Farm?
On the edge of Immingham, Humberside, United Kingdom (postcode DN41 8BS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).