Marley Lane Solar Farm & Battery Storage

Operator Enso Energy Limited · Owner Priory Energy Limited

Application RefusedData checked 16 November 2026Source record dated 26 January 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Marley Lane Solar Farm & Battery Storage is a battery storage site 5.6 km north-east of Sturry, Kent, United Kingdom. Its planning application (CA/25/00570) went to Canterbury on 27 March 2025 and was refused on 8 December 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 26 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 16 other sites and 230 energy sites within 40 km for Marley Lane Solar Farm & Battery Storage

Members see the sites and incidents around this one, and every record behind them.

ENSO ENERGY LIMITED (09892057), active, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Co-located with RE)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Enso Energy Limited
Owner
Priory Energy Limited
Location
Land South Of Marley Lane Hoath, Kent, CT3 4DT, United Kingdom
Planning authority
Canterbury
Planning application
CA/25/00570

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CA/25/00570, with what the planning evidence pack adds for this site.

Every application in Canterbury · Alerts for applications and incidents near here

  • 27 March 2025 Planning application submitted
  • 8 December 2025 Planning permission refused

None found. The register holds no published incident that names Marley Lane Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Marley Lane Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Marley Lane Solar Farm & Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Marley Lane Solar Farm & Battery Storage?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 26 January 2026.
Where is Marley Lane Solar Farm & Battery Storage?
5.6 km north-east of Sturry, Kent, United Kingdom (postcode CT3 4DT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).