Mandrione solar farm

Owner BNZ [100%]

Under construction35 MWData checked 8 October 2026Source record dated 15 January 2025

Watch this siteIts incidents, owner and operator, in your workspace and by email. 7 days free, no card.

Mandrione solar farm is a 35 MW solar farm 7.9 km west of Vieste, Foggia, Italy. Its status in the Global Energy Monitor solar and wind trackers is under construction. There is one other energy site within 10 km. The register holds no incident at this site. It holds 24 incidents at solar farms (hybrid battery and solar sites included) in Italy, and 490 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mandrione solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 24 comparable solar incidents in Italy, nearest first. The nearest is EIR-2656, Rooftop solar array fire at Termoli warehouse, Italy, 91 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-26562026Rooftop solar array fire at Termoli warehouse, Italy91 kmMinor
EIR-23672026Fire damages rooftop solar array at Salpa-Rolli plant in Italy190 kmSignificant
EIR-11822026Transformer fire at photovoltaic plant in Offida225 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
35 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Under construction (Construction)
Owner
BNZ [100%]
Location
Mandrione, Foggia, Italy

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Mandrione solar farm. If you know of one, report it (confidential reports are anonymised).

Has Mandrione solar farm had a fire or other incident?
None is on the register as of 26 November 2026. The register holds no published incident that names Mandrione solar farm; it holds 24 incidents at solar farms (hybrid battery and solar sites included) in Italy.
What is the status of Mandrione solar farm?
Under construction, in the Global Energy Monitor solar and wind trackers, where it last changed on 15 January 2025.
Where is Mandrione solar farm?
7.9 km west of Vieste, Foggia, Italy.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).