Battery storage · United Kingdom
Maltby / CLNR EES1
Operator Northern Powergrid
Decommissioned0.1 MWData checked 16 November 2026Source record dated 1 October 2016
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Maltby / CLNR EES1 is a 0.1 MW battery storage site in Maltby, South Yorkshire, United Kingdom. Its planning application went to Rotherham on 5 May 2005. It has been operating since 15 September 2013. Its status in the Renewable Energy Planning Database (UK government) is decommissioned. There are 41 other energy sites within 10 km, 19 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Maltby / CLNR EES1 changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
NORTHERN POWERGRID LIMITED (03271033), active, since 1996. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 0.1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Decommissioned
- Operator or applicant
- Northern Powergrid
- Location
- Maltby, South Yorkshire, South Yorkshire, S66 7PZ, United Kingdom
- Planning authority
- Rotherham
- First operating
- 2013
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Rotherham · Alerts for applications and incidents near here
Timeline
- 5 May 2005 Planning application submitted
- 15 August 2013 Construction started
- 15 September 2013 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Maltby / CLNR EES1. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Maltby / CLNR EES1 had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Maltby / CLNR EES1; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Maltby / CLNR EES1?
- Decommissioned, in the Renewable Energy Planning Database (UK government), where it last changed on 1 October 2016.
- Where is Maltby / CLNR EES1?
- In Maltby, South Yorkshire, United Kingdom (postcode S66 7PZ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).