Battery storage · United Kingdom

Maggots End Road, Berden - Solar Farm & Battery Storage

Operator Low Carbon Limited · Owner Low Carbon Holdco Limited

RevisedData checked 16 November 2026Source record dated 17 November 2021

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Maggots End Road, Berden - Solar Farm & Battery Storage is a battery storage site 4.7 km north-west of Stansted Mountfitchet, Hertfordshire, United Kingdom. Its planning application (UTT/21/3356/FUL) went to Uttlesford on 12 November 2021 and was refused on 24 January 2022. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 33 other energy sites within 10 km, 12 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

LOW CARBON LIMITED (13356797), active, since 2021. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Maggots End Road, Berden - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 53 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction53 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire145 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells158 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Revised
Operator or applicant
Low Carbon Limited
Owner
Low Carbon Holdco Limited
Location
Pelham Substation Maggots End Road Manuden, Hertfordshire, CM23 1BJ, United Kingdom
Planning authority
Uttlesford
Planning application
UTT/21/3356/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for UTT/21/3356/FUL, with what the planning evidence pack adds for this site.

Every application in Uttlesford · Alerts for applications and incidents near here

  • 12 November 2021 Planning application submitted
  • 24 January 2022 Planning permission refused

None found. The register holds no published incident that names Maggots End Road, Berden - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Maggots End Road, Berden - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Maggots End Road, Berden - Solar Farm & Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Maggots End Road, Berden - Solar Farm & Battery Storage?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 17 November 2021.
Where is Maggots End Road, Berden - Solar Farm & Battery Storage?
4.7 km north-west of Stansted Mountfitchet, Hertfordshire, United Kingdom (postcode CM23 1BJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).