Solar · United Kingdom
Macaulay Lane Solar Farm
Operator SEC Power 3 Limited
Application Withdrawn8 MWData checked 16 November 2026Source record dated 23 September 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Macaulay Lane Solar Farm is a 8 MW solar farm on the edge of Grimsby, Lincolnshire, United Kingdom. Its planning application (DM/0331/21/FUL) went to North East Lincolnshire on 4 May 2021 and was withdrawn on 9 September 2022. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 55 other energy sites within 10 km, 34 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Macaulay Lane Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- SEC Power 3 Limited
- Location
- Macaulay Lane Former Refuse Disposal Site Macaulay Street Grimsby, Lincolnshire, DN31, United Kingdom
- Planning authority
- North East Lincolnshire
- Planning application
- DM/0331/21/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DM/0331/21/FUL, with what the planning evidence pack adds for this site.
Every application in North East Lincolnshire · Alerts for applications and incidents near here
Timeline
- 4 May 2021 Planning application submitted
- 9 September 2022 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Macaulay Lane Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Macaulay Lane Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Macaulay Lane Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Macaulay Lane Solar Farm?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 23 September 2022.
- Where is Macaulay Lane Solar Farm?
- On the edge of Grimsby, Lincolnshire, United Kingdom (postcode DN31).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).