Solar · United Kingdom

Lyreco - Telford Distribution Centre

Operator Addison Energy

Operational3.8 MWData checked 16 November 2026Source record dated 26 January 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Lyreco - Telford Distribution Centre is a 3.8 MW solar farm on the edge of Oakengates, Shropshire, United Kingdom. Its planning application went to Telford and Wrekin. It has been operating since 26 January 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 44 other energy sites within 10 km, 26 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

417 energy sites within 40 km for Lyreco - Telford Distribution Centre

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
3.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Addison Energy
Location
Deer Park Court, Telford, Shropshire, United Kingdom
Planning authority
Telford and Wrekin
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Telford and Wrekin · Alerts for applications and incidents near here

  • 30 August 2015 Construction started
  • 26 January 2016 Operational

None found. The register holds no published incident that names Lyreco - Telford Distribution Centre. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Lyreco - Telford Distribution Centre had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lyreco - Telford Distribution Centre; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Lyreco - Telford Distribution Centre?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 26 January 2016.
Where is Lyreco - Telford Distribution Centre?
On the edge of Oakengates, Shropshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).