Onshore wind · United Kingdom
Ludenhill, Lochside Road - Wind Turbine
Operator Constantine Wind Energy
Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 3 April 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Ludenhill, Lochside Road - Wind Turbine is a 0.5 MW wind farm 23 km north-west of Kirkwall, Islands, United Kingdom. Its planning application (23/295/TPP) went to Orkney Islands on 24 August 2023 and was granted on 26 March 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 10 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Ludenhill, Lochside Road - Wind Turbine changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ludenhill, Lochside Road - Wind Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-2512, Fire at Viking Wind Farm construction site on Shetland, 171 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2512 | 2023 | Fire at Viking Wind Farm construction site on Shetland | 171 km | Minor |
| EIR-1291 | 2022 | Fatality at Viking wind farm site in Shetland Islands | 171 km | Major |
| EIR-0767 | 2024 | Nordex turbine fire prompts investigation at Scottish wind farm | 266 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 0.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Constantine Wind Energy
- Location
- Ludenhill, Lochside Road, Birsay, Islands, KW17 2NR, United Kingdom
- Planning authority
- Orkney Islands
- Planning application
- 23/295/TPP
- Turbines
- 1, 76 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/295/TPP, with what the planning evidence pack adds for this site.
Every application in Orkney Islands · Alerts for applications and incidents near here
Timeline
- 24 August 2023 Planning application submitted
- 26 March 2024 Planning permission granted
- 27 March 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Ludenhill, Lochside Road - Wind Turbine. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Ludenhill, Lochside Road - Wind Turbine had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Ludenhill, Lochside Road - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Ludenhill, Lochside Road - Wind Turbine?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 3 April 2024.
- Where is Ludenhill, Lochside Road - Wind Turbine?
- 23 km north-west of Kirkwall, Islands, United Kingdom (postcode KW17 2NR).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).