Planning pack for this site, £295Other options

Solar · United Kingdom

Long Green Farm

Operator Private Developer

Application Submitted0.2 MWData checked 16 November 2026Source record dated 30 September 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Long Green Farm is a 0.2 MW solar farm 9.8 km south of Barnard Castle, North Yorkshire, United Kingdom. Its planning application (20/00400/FULL) went to North Yorkshire on 10 June 2020. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There is one other energy site within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Long Green Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1502, Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre, 28 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre28 kmMinor
EIR-14992025Solar panels linked to fires at council buildings in Northumberland73 kmSignificant
EIR-27212025Solar panel fire breaks out at Shanklea Primary School73 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Private Developer
Location
Long Green Farm, Hurst Moor Road, Barningham, Richmond, North Yorkshire, North Yorkshire, DL11 7EF, United Kingdom
Planning authority
North Yorkshire
Planning application
20/00400/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/00400/FULL, with what the planning evidence pack adds for this site.

Every application in North Yorkshire · Alerts for applications and incidents near here

  • 10 June 2020 Planning application submitted

None found. The register holds no published incident that names Long Green Farm. If you know of one, report it (confidential reports are anonymised).

Has Long Green Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Long Green Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Long Green Farm?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 30 September 2020.
Where is Long Green Farm?
9.8 km south of Barnard Castle, North Yorkshire, United Kingdom (postcode DL11 7EF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).